|
Main Criteria:
Not yet operational. The port is nominated a ‘green field’
site port to be developed through private sector participation.
Cargoes planned:
Crude oil, oil products, LPG and chemicals;
Trade estimate 2010:
1.2 mln tonnes;
Facilities planned:
Port facilities in depth of
10m at a distance of 5 km from the shore. Include an SBM and jetty
on behalf of Hindustan Petroleum;
Infrastructure:
Rail 30km missing to
Maroli railway station, road upgrading for 35km required.
|