Main Criteria:
Simar is a ‘green-field’ port site, to be developed through
private sector participation.
Trade estimate 2010:
9.8 mln tonnes.
Facilities planned:
Berthing facilities for Cape-Size + vessels, since the 20m contour line runs
just 1 km from the shore.
Infrastructure:
The rail connection between Simar and Delwada has
yet to be constructed.
|