Home | Sitemap | Search | Contact | Feedback
Your browser does not support script
Alang Ship Recycling
Home >> Alang Ship Recycling Yard >> Infrastructure Facilities
Road:
All the 173 plots are connected by 10 km long-four lane service road with concrete pavement.
Two independent approach roads connects Alang and Sosiya yard to state highways.
40 km long link roads are well maintained for efficient all-weather traffic movement
Bridges: Two major RCC bridges having two-lane width are constructed across the river "Manari" and "Pashvivali", to facilitate movement along the service road.
Water supply:
Adequate water is being supplied to the plots and allied institutes.
o A full-fledged water supply scheme is completed. This will enable supply of 3 MLD potable water in the yard.
Yard lighting:
The State Electricity Board is supplying adequate power.
HPSV Street lights illuminate road network and yard area.
Fire Fighting:
Fire fighting force is headed by Fire Officer, and equipped with adequate fire personnel, tenders, foam tenders, water tankers, trailer pumps, etc.
Two underground tanks, each of 3-lakh liters capacity is available in the yard.
One tube well is dug at Alang to fetch water for fire fighting.
Community Sanitation:
Community sanitary complexes are established at four locations in the yard.
Allied services:
Next >>
Infrastructure Development Work
Four Lane Service Road With Concrete Pavment.
Two Lane Bridge Across Manari River.
Practical Demonstration about Safety Gadgets
Mobile Medical Van With Doctor For Emergency Treatment
Copyright 2007-2008